Ridgewood RI Generation Phase I (106)

Ridgewood RI Generation Phase I is a 4.2 MW gas interconnection project in Providence, Rhode Island with a current status of operational. It is proposed to connect at Johnston Substation Distribution System.

4.2 MWCapacity
OperationalStatus
RIMarket
GasTechnology

Project facts

Canonical nameRidgewood RI Generation Phase I
Queue ID106
Statusoperational
Source statusC
MarketRI
TechnologyGas
Capacity4.2 MW
StateRhode Island
CountyProvidence
Point of interconnectionJohnston Substation Distribution System
Requested (queue) date2003-03-18
Proposed in-service date
Operational date2004-02-18
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata