Riley-Jay-Otis-Livermore (951)

Riley-Jay-Otis-Livermore is a 28.3 MW other interconnection project in Androscoggin/Franklin, Maine with a current status of operational. It is proposed to connect at CMP 115 kV Section 230.

28.3 MWCapacity
OperationalStatus
MEMarket
OtherTechnology

Project facts

Canonical nameRiley-Jay-Otis-Livermore
Queue ID951
Statusoperational
Source statusC
MarketME
TechnologyOther
Capacity28.3 MW
StateMaine
CountyAndroscoggin/Franklin
Point of interconnectionCMP 115 kV Section 230
Requested (queue) date2020-02-03
Proposed in-service date
Operational date2024-11-01
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata