Ripley-Nanjemoy 69kV (AC2-101)

Ripley-Nanjemoy 69kV is a 32.5 MW solar interconnection project in Charles, Maryland with a current status of withdrawn.

32.5 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameRipley-Nanjemoy 69kV
Queue IDAC2-101
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity32.5 MW
StateMaryland
CountyCharles
Point of interconnection—
Requested (queue) date2017-03-10
Proposed in-service date2021-03-15
Operational date—
Withdrawn date2020-12-03
Developer—
Utility / transmission ownerSMECO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.