Ripley-Westfield Wind II (0258)

Ripley-Westfield Wind II is a 124.8 MW wind interconnection project in Chautauqua, New York with a current status of withdrawn. It is proposed to connect at Ripley - Dunkirk 230kV.

124.8 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameRipley-Westfield Wind II
Queue ID0258
Statuswithdrawn
Source status0
Market—
TechnologyWind
Capacity124.8 MW
StateNew York
CountyChautauqua
Point of interconnectionRipley - Dunkirk 230kV
Requested (queue) date2007-09-24
Proposed in-service date2007-10-16
Operational date—
Withdrawn date—
DeveloperBabcock & Brown, LP
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata