RISEP Increase (332)

RISEP Increase is a 66.0 MW gas interconnection project in Providence, Rhode Island with a current status of operational. It is proposed to connect at 115 kV RISE substation.

66.0 MWCapacity
OperationalStatus
RIMarket
GasTechnology

Project facts

Canonical nameRISEP Increase
Queue ID332
Statusoperational
Source statusC
MarketRI
TechnologyGas
Capacity66.0 MW
StateRhode Island
CountyProvidence
Point of interconnection115 kV RISE substation
Requested (queue) date2010-05-13
Proposed in-service date
Operational date2012-11-12
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.