Riverton - Neosho 161 kV Line Tap (GEN-2023-194)

Riverton - Neosho 161 kV Line Tap is a 225.0 MW solar interconnection project in Cherokee, Kansas with a current status of withdrawn. It is proposed to connect at Riverton - Neosho 161 kV Line Tap.

225.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameRiverton - Neosho 161 kV Line Tap
Queue IDGEN-2023-194
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity225.0 MW
StateKansas
CountyCherokee
Point of interconnectionRiverton - Neosho 161 kV Line Tap
Requested (queue) date2023-10-02
Proposed in-service date2028-12-31
Operational date
Withdrawn date2025-08-25
Developer
Utility / transmission ownerEDE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata