Rock River 138 kV Substations 1 (6 RICE) and 2 (5 RICE) (J2947)

Rock River 138 kV Substations 1 (6 RICE) and 2 (5 RICE) is a 205.0 MW gas interconnection project in Rock, Wisconsin with a current status of operational. It is proposed to connect at Rock River 138 kV Substations 1 (6 RICE) and 2 (5 RICE).

205.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameRock River 138 kV Substations 1 (6 RICE) and 2 (5 RICE)
Queue IDJ2947
Statusoperational
Source statusActive
Market
TechnologyGas
Capacity205.0 MW
StateWisconsin
CountyRock
Point of interconnectionRock River 138 kV Substations 1 (6 RICE) and 2 (5 RICE)
Requested (queue) date2022-09-15
Proposed in-service date2026-04-01
Operational date2026-04-01
Withdrawn date
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata