Rock Springs-Peach Bottom 500kV (AA2-109)
Rock Springs-Peach Bottom 500kV is a 1,100.0 MW gas interconnection project in Lancaster, Pennsylvania with a current status of withdrawn.
1,100.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology
Project facts
| Canonical name | Rock Springs-Peach Bottom 500kV |
|---|---|
| Queue ID | AA2-109 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Gas |
| Capacity | 1,100.0 MW |
| State | Pennsylvania |
| County | Lancaster |
| Point of interconnection | — |
| Requested (queue) date | 2015-04-27 |
| Proposed in-service date | 2019-06-01 |
| Operational date | — |
| Withdrawn date | 2016-02-04 |
| Developer | — |
| Utility / transmission owner | PECO |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata