Roosevelt 230kV Substation (GEN-2023-178)

Roosevelt 230kV Substation is a 200.0 MW solar interconnection project in Roosevelt, New Mexico with a current status of withdrawn. It is proposed to connect at Roosevelt 230kV Substation.

200.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameRoosevelt 230kV Substation
Queue IDGEN-2023-178
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity200.0 MW
StateNew Mexico
CountyRoosevelt
Point of interconnectionRoosevelt 230kV Substation
Requested (queue) date2023-10-02
Proposed in-service date2026-12-01
Operational date
Withdrawn date2025-08-25
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.