Roosevelt County (58771_GEN1)

Roosevelt County is a 250.0 MW wind interconnection project in Roosevelt, New Mexico with a current status of operational.

250.0 MWCapacity
OperationalStatus
SWPPMarket
WindTechnology

Project facts

Canonical nameRoosevelt County
Queue ID58771_GEN1
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologyWind
Capacity250.0 MW
StateNew Mexico
CountyRoosevelt
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2015-12-01
Withdrawn date
Developer
Utility / transmission ownerBoralex US Operations LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata