Rose Hill 345 kV Substation (GEN-2023-073)

Rose Hill 345 kV Substation is a 250.0 MW battery interconnection project in Butler, Kansas with a current status of withdrawn. It is proposed to connect at Rose Hill 345 kV Substation.

250.0 MWCapacity
WithdrawnStatus
KSMarket
BatteryTechnology

Project facts

Canonical nameRose Hill 345 kV Substation
Queue IDGEN-2023-073
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyBattery
Capacity250.0 MW
StateKansas
CountyButler
Point of interconnectionRose Hill 345 kV Substation
Requested (queue) date2023-10-02
Proposed in-service date2027-12-27
Operational date—
Withdrawn date2025-08-25
Developer—
Utility / transmission ownerEvergy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.