Roseglen 115 kV Substation (GEN-2024-174)

Roseglen 115 kV Substation is a 130.0 MW battery interconnection project in Mercer, North Dakota with a current status of withdrawn. It is proposed to connect at Roseglen 115 kV Substation.

130.0 MWCapacity
WithdrawnStatus
NDMarket
BatteryTechnology

Project facts

Canonical nameRoseglen 115 kV Substation
Queue IDGEN-2024-174
Statuswithdrawn
Source statusWITHDRAWN
MarketND
TechnologyBattery
Capacity130.0 MW
StateNorth Dakota
CountyMercer
Point of interconnectionRoseglen 115 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date2028-05-17
Operational date
Withdrawn date2025-12-05
Developer
Utility / transmission ownerCPEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata