Route 318 is a 19.9 MW solar interconnection project in Seneca, New York with a current status of withdrawn. It is proposed to connect at Hook Road - Elbridge 115 kV .

19.9 MWCapacity
WithdrawnStatus
CMarket
SolarTechnology

Project facts

Canonical nameRoute 318
Queue ID1072
Statuswithdrawn
Source status0
MarketC
TechnologySolar
Capacity19.9 MW
StateNew York
CountySeneca
Point of interconnectionHook Road - Elbridge 115 kV
Requested (queue) date2020-08-06
Proposed in-service date2021-02-28
Operational date
Withdrawn date
DeveloperDelaware River Solar
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.