Rum Creek 138kV is a 59.5 MW solar interconnection project in N/a, West Virginia with a current status of withdrawn.

59.5 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameRum Creek 138kV
Queue IDAI2-444
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity59.5 MW
StateWest Virginia
CountyN/a
Point of interconnection
Requested (queue) date2023-03-10
Proposed in-service date2026-03-08
Operational date
Withdrawn date2026-01-21
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.