Rumford Uprate and Battery addition (1113)

Rumford Uprate and Battery addition is a 8.5 MW battery interconnection project in Oxford, Maine with a current status of operational. It is proposed to connect at 11.5kV bus at Brookfield owned existing Rumford Falls Substation which is connected to the CMP 115kV 218 Line..

8.5 MWCapacity
OperationalStatus
MEMarket
BatteryTechnology

Project facts

Canonical nameRumford Uprate and Battery addition
Queue ID1113
Statusoperational
Source statusC
MarketME
TechnologyBattery
Capacity8.5 MW
StateMaine
CountyOxford
Point of interconnection11.5kV bus at Brookfield owned existing Rumford Falls Substation which is connected to the CMP 115kV 218 Line.
Requested (queue) date2021-03-24
Proposed in-service date
Operational date2023-05-05
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata