Rural Substation (L0468)
Rural Substation is a 7.1 MW other interconnection project in Minidoka, Idaho with a current status of operational. It is proposed to connect at BPA Heyburn-Adelaide Pole 6/2 or 6/3.
7.1 MWCapacity
OperationalStatus
IDMarket
OtherTechnology
Project facts
| Canonical name | Rural Substation |
|---|---|
| Queue ID | L0468 |
| Status | operational |
| Source status | ENERGIZED |
| Market | ID |
| Technology | Other |
| Capacity | 7.1 MW |
| State | Idaho |
| County | Minidoka |
| Point of interconnection | BPA Heyburn-Adelaide Pole 6/2 or 6/3 |
| Requested (queue) date | 2019-10-09 |
| Proposed in-service date | — |
| Operational date | 2022-09-30 |
| Withdrawn date | — |
| Developer | United Electric Co-op, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata