Rush Solar & BESS (1518)

Rush Solar & BESS is a 21.0 MW other interconnection project in Monroe, New York with a current status of withdrawn. It is proposed to connect at Mortimer to Golah 115kV.

21.0 MWCapacity
WithdrawnStatus
BMarket
OtherTechnology

Project facts

Canonical nameRush Solar & BESS
Queue ID1518
Statuswithdrawn
Source status0
MarketB
TechnologyOther
Capacity21.0 MW
StateNew York
CountyMonroe
Point of interconnectionMortimer to Golah 115kV
Requested (queue) date2023-02-13
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperHodson Energy Rush LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata