Sabine 138 & 230 kV (bus #334440, #334431, #334433 (R1003)
Sabine 138 & 230 kV (bus #334440, #334431, #334433 is a 1,166.0 MW generation interconnection project with a current status of operational. It is proposed to connect at Sabine 138 & 230 kV (bus #334440, #334431, #334433.
1,166.0 MWCapacity
OperationalStatus
—Market
GenerationTechnology
Project facts
| Canonical name | Sabine 138 & 230 kV (bus #334440, #334431, #334433 |
|---|---|
| Queue ID | R1003 |
| Status | operational |
| Source status | Done |
| Market | — |
| Technology | Generation |
| Capacity | 1,166.0 MW |
| State | — |
| County | Orange |
| Point of interconnection | Sabine 138 & 230 kV (bus #334440, #334431, #334433 |
| Requested (queue) date | 2020-08-05 |
| Proposed in-service date | 2026-05-31 |
| Operational date | 2026-05-31 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ENTERGY ARKANSAS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata