Saddleback Increase and CNR (see Q287) (407)
Saddleback Increase and CNR (see Q287) is a 1.2 MW wind interconnection project in Franklin, Maine with a current status of operational. It is proposed to connect at CMP Ludden Lane Substation.
1.2 MWCapacity
OperationalStatus
MEMarket
WindTechnology
Project facts
| Canonical name | Saddleback Increase and CNR (see Q287) |
|---|---|
| Queue ID | 407 |
| Status | operational |
| Source status | C |
| Market | ME |
| Technology | Wind |
| Capacity | 1.2 MW |
| State | Maine |
| County | Franklin |
| Point of interconnection | CMP Ludden Lane Substation |
| Requested (queue) date | 2013-02-27 |
| Proposed in-service date | — |
| Operational date | 2015-09-15 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.