Saddleback Increase and CNR (see Q287) (407)

Saddleback Increase and CNR (see Q287) is a 1.2 MW wind interconnection project in Franklin, Maine with a current status of operational. It is proposed to connect at CMP Ludden Lane Substation.

1.2 MWCapacity
OperationalStatus
MEMarket
WindTechnology

Project facts

Canonical nameSaddleback Increase and CNR (see Q287)
Queue ID407
Statusoperational
Source statusC
MarketME
TechnologyWind
Capacity1.2 MW
StateMaine
CountyFranklin
Point of interconnectionCMP Ludden Lane Substation
Requested (queue) date2013-02-27
Proposed in-service date
Operational date2015-09-15
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata