SALMON FALLS WIND (2152)
SALMON FALLS WIND is a 800.0 MW wind interconnection project in Twin Falls, Idaho with a current status of withdrawn. It is proposed to connect at Harry Allen-Eldorado 500 kV.
800.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology
Project facts
| Canonical name | SALMON FALLS WIND |
|---|---|
| Queue ID | 2152 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | — |
| Technology | Wind |
| Capacity | 800.0 MW |
| State | Idaho |
| County | Twin Falls |
| Point of interconnection | Harry Allen-Eldorado 500 kV |
| Requested (queue) date | 2021-04-15 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2023-01-13 |
| Developer | — |
| Utility / transmission owner | DSLK |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata