Salzer Valley Substation (L0394)

Salzer Valley Substation is a 50.0 MW other interconnection project in Lewis, Washington with a current status of active. It is proposed to connect at Chehalis-Centralia transmission line.

50.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology

Project facts

Canonical nameSalzer Valley Substation
Queue IDL0394
Statusactive
Source statusSTUDY
MarketWA
TechnologyOther
Capacity50.0 MW
StateWashington
CountyLewis
Point of interconnectionChehalis-Centralia transmission line
Requested (queue) date2016-01-22
Proposed in-service date2018-10-01
Operational date
Withdrawn date
DeveloperCity of Centralia
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata