San Fermin Solar Farm Hybrid (61110_BESS)

San Fermin Solar Farm Hybrid is a 3.6 MW battery interconnection project with a current status of operational.

3.6 MWCapacity
OperationalStatus
NAMarket
BatteryTechnology

Project facts

Canonical nameSan Fermin Solar Farm Hybrid
Queue ID61110_BESS
Statusoperational
Source status(OP) Operating
MarketNA
TechnologyBattery
Capacity3.6 MW
StatePR
CountyCanovanas
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2015-12-01
Withdrawn date
Developer
Utility / transmission ownerSan Fermin Solar Farm LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata