San Fermin Solar Farm Hybrid (61110_DSL)

San Fermin Solar Farm Hybrid is a 4.0 MW other interconnection project with a current status of operational.

4.0 MWCapacity
OperationalStatus
NAMarket
OtherTechnology

Project facts

Canonical nameSan Fermin Solar Farm Hybrid
Queue ID61110_DSL
Statusoperational
Source status(OP) Operating
MarketNA
TechnologyOther
Capacity4.0 MW
StatePR
CountyCanovanas
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2015-12-01
Withdrawn date—
Developer—
Utility / transmission ownerSan Fermin Solar Farm LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata