San Juan Mesa 230 kV Line (GEN-2020-063)
San Juan Mesa 230 kV Line is a 184.0 MW solar interconnection project in Roosevelt, New Mexico with a current status of withdrawn. It is proposed to connect at San Juan Mesa 230 kV Line.
184.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology
Project facts
| Canonical name | San Juan Mesa 230 kV Line |
|---|---|
| Queue ID | GEN-2020-063 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | NM |
| Technology | Solar |
| Capacity | 184.0 MW |
| State | New Mexico |
| County | Roosevelt |
| Point of interconnection | San Juan Mesa 230 kV Line |
| Requested (queue) date | 2020-04-29 |
| Proposed in-service date | 2026-03-01 |
| Operational date | — |
| Withdrawn date | 2023-04-06 |
| Developer | — |
| Utility / transmission owner | SPS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata