San Juan Tap 230kV (GEN-2001-033)

San Juan Tap 230kV is a 120.0 MW wind interconnection project in Chaves County (Melrose), New Mexico with a current status of operational. It is proposed to connect at San Juan Tap 230kV.

120.0 MWCapacity
OperationalStatus
NMMarket
WindTechnology

Project facts

Canonical nameSan Juan Tap 230kV
Queue IDGEN-2001-033
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketNM
TechnologyWind
Capacity120.0 MW
StateNew Mexico
CountyChaves County (Melrose)
Point of interconnectionSan Juan Tap 230kV
Requested (queue) date2001-09-17
Proposed in-service date
Operational date2002-10-01
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata