San Juan Tap 230kV (GEN-2001-033)
San Juan Tap 230kV is a 120.0 MW wind interconnection project in Chaves County (Melrose), New Mexico with a current status of operational. It is proposed to connect at San Juan Tap 230kV.
120.0 MWCapacity
OperationalStatus
NMMarket
WindTechnology
Project facts
| Canonical name | San Juan Tap 230kV |
|---|---|
| Queue ID | GEN-2001-033 |
| Status | operational |
| Source status | IA FULLY EXECUTED/COMMERCIAL OPERATION |
| Market | NM |
| Technology | Wind |
| Capacity | 120.0 MW |
| State | New Mexico |
| County | Chaves County (Melrose) |
| Point of interconnection | San Juan Tap 230kV |
| Requested (queue) date | 2001-09-17 |
| Proposed in-service date | — |
| Operational date | 2002-10-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | SPS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata