Sanford Airport Solar CNR only is a 50.0 MW solar interconnection project in York, Maine with a current status of operational. It is proposed to connect at CMP's Sanford - Maguire 115 kV line, section 237.
50.0 MWCapacity
OperationalStatus
MEMarket
SolarTechnology
Project facts
| Canonical name | Sanford Airport Solar CNR only |
|---|---|
| Queue ID | 840 |
| Status | operational |
| Source status | C |
| Market | ME |
| Technology | Solar |
| Capacity | 50.0 MW |
| State | Maine |
| County | York |
| Point of interconnection | CMP's Sanford - Maguire 115 kV line, section 237 |
| Requested (queue) date | 2019-03-01 |
| Proposed in-service date | — |
| Operational date | 2020-11-07 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata