Saratoga - Badger West 138.0kV (S1096)

Saratoga - Badger West 138.0kV is a 50.3 MW solar+battery interconnection project in Wood, Wisconsin with a current status of operational. It is proposed to connect at Saratoga - Badger West 138.0kV.

50.3 MWCapacity
OperationalStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameSaratoga - Badger West 138.0kV
Queue IDS1096
Statusoperational
Source statusActive
Market
TechnologySolar+Battery
Capacity50.3 MW
StateWisconsin
CountyWood
Point of interconnectionSaratoga - Badger West 138.0kV
Requested (queue) date2025-05-20
Proposed in-service date2028-02-01
Operational date2028-02-01
Withdrawn date
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.