Sawtooth DevCo, LLC (661)

Sawtooth DevCo, LLC is a 1,000.0 MW solar+battery interconnection project in Sweetwater, Wyoming with a current status of suspended. It is proposed to connect at JBRG 345kV Substation.

1,000.0 MWCapacity
SuspendedStatus
WYMarket
Solar+BatteryTechnology

Project facts

Canonical nameSawtooth DevCo, LLC
Queue ID661
Statussuspended
Source statusSuspended
MarketWY
TechnologySolar+Battery
Capacity1,000.0 MW
StateWyoming
CountySweetwater
Point of interconnectionJBRG 345kV Substation
Requested (queue) date2022-06-16
Proposed in-service date2025-12-31
Operational date
Withdrawn date
DeveloperSawtooth DevCo, LLC
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectsuspendedhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata