Saxman 115kV substation (GEN-2019-018)

Saxman 115kV substation is a 15.6 MW gas interconnection project in Rice, Kansas with a current status of operational. It is proposed to connect at Saxman 115kV substation.

15.6 MWCapacity
OperationalStatus
KSMarket
GasTechnology

Project facts

Canonical nameSaxman 115kV substation
Queue IDGEN-2019-018
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketKS
TechnologyGas
Capacity15.6 MW
StateKansas
CountyRice
Point of interconnectionSaxman 115kV substation
Requested (queue) date2019-04-24
Proposed in-service date
Operational date2020-03-01
Withdrawn date
Developer
Utility / transmission ownerMIDW

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata