SC Queue Project 163 — Solar+Battery in Sumter, South Carolina

SC Queue Project 163 — Solar+Battery in Sumter, South Carolina is a 50.0 MW solar+battery interconnection project in Sumter, South Carolina with a current status of withdrawn. It is proposed to connect at Dalzell 230 kV Bus.

50.0 MWCapacity
WithdrawnStatus
SCMarket
Solar+BatteryTechnology

Project facts

Canonical nameSC Queue Project 163 — Solar+Battery in Sumter, South Carolina
Queue ID163
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologySolar+Battery
Capacity50.0 MW
StateSouth Carolina
CountySumter
Point of interconnectionDalzell 230 kV Bus
Requested (queue) date2021-06-02
Proposed in-service date2024-08-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata