SC Queue Project 174 — Solar in Chesterfield, South Carolina

SC Queue Project 174 — Solar in Chesterfield, South Carolina is a 74.0 MW solar interconnection project in Chesterfield, South Carolina with a current status of withdrawn. It is proposed to connect at TBD.

74.0 MWCapacity
WithdrawnStatus
SCMarket
SolarTechnology

Project facts

Canonical nameSC Queue Project 174 — Solar in Chesterfield, South Carolina
Queue ID174
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologySolar
Capacity74.0 MW
StateSouth Carolina
CountyChesterfield
Point of interconnectionTBD
Requested (queue) date2022-02-11
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.