SC Queue Project 201 — Solar+Battery in Kershaw, South Carolina

SC Queue Project 201 — Solar+Battery in Kershaw, South Carolina is a 190.0 MW solar+battery interconnection project in Kershaw, South Carolina with a current status of withdrawn. It is proposed to connect at South Bethune 230 & 69 kV Sw. Stat..

190.0 MWCapacity
WithdrawnStatus
SCMarket
Solar+BatteryTechnology

Project facts

Canonical nameSC Queue Project 201 — Solar+Battery in Kershaw, South Carolina
Queue ID201
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologySolar+Battery
Capacity190.0 MW
StateSouth Carolina
CountyKershaw
Point of interconnectionSouth Bethune 230 & 69 kV Sw. Stat.
Requested (queue) date2023-06-01
Proposed in-service date2027-02-19
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.