SC Queue Project 226 — Solar+Battery in Kershaw, South Carolina

SC Queue Project 226 — Solar+Battery in Kershaw, South Carolina is a 80.0 MW solar+battery interconnection project in Kershaw, South Carolina with a current status of withdrawn. It is proposed to connect at N/A.

80.0 MWCapacity
WithdrawnStatus
SCMarket
Solar+BatteryTechnology

Project facts

Canonical nameSC Queue Project 226 — Solar+Battery in Kershaw, South Carolina
Queue ID226
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologySolar+Battery
Capacity80.0 MW
StateSouth Carolina
CountyKershaw
Point of interconnectionN/A
Requested (queue) date2023-06-01
Proposed in-service date2026-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.