SC Queue Project 258 — Battery in Aiken, South Carolina

SC Queue Project 258 — Battery in Aiken, South Carolina is a 74.9 MW battery interconnection project in Aiken, South Carolina with a current status of withdrawn. It is proposed to connect at N/A.

74.9 MWCapacity
WithdrawnStatus
SCMarket
BatteryTechnology

Project facts

Canonical nameSC Queue Project 258 — Battery in Aiken, South Carolina
Queue ID258
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologyBattery
Capacity74.9 MW
StateSouth Carolina
CountyAiken
Point of interconnectionN/A
Requested (queue) date2024-05-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata