SC Queue Project 264 — Solar in Clarendon, South Carolina

SC Queue Project 264 — Solar in Clarendon, South Carolina is a 75.0 MW solar interconnection project in Clarendon, South Carolina with a current status of withdrawn.

75.0 MWCapacity
WithdrawnStatus
SCMarket
SolarTechnology

Project facts

Canonical nameSC Queue Project 264 — Solar in Clarendon, South Carolina
Queue ID264
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologySolar
Capacity75.0 MW
StateSouth Carolina
CountyClarendon
Point of interconnection
Requested (queue) date2024-06-05
Proposed in-service date2028-08-05
Operational date
Withdrawn date
Developer
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata