SC Queue Project 278 — Solar in Williamsburg, South Carolina

SC Queue Project 278 — Solar in Williamsburg, South Carolina is a 149.5 MW solar interconnection project in Williamsburg, South Carolina with a current status of withdrawn. It is proposed to connect at HEMINGWAY 230 - 115 SUBSTATION (230 kV Bus).

149.5 MWCapacity
WithdrawnStatus
SCMarket
SolarTechnology

Project facts

Canonical nameSC Queue Project 278 — Solar in Williamsburg, South Carolina
Queue ID278
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologySolar
Capacity149.5 MW
StateSouth Carolina
CountyWilliamsburg
Point of interconnectionHEMINGWAY 230 - 115 SUBSTATION (230 kV Bus)
Requested (queue) date2024-06-05
Proposed in-service date2028-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata