SC Queue Project 284 — Gas in Colleton, South Carolina

SC Queue Project 284 — Gas in Colleton, South Carolina is a 337.5 MW gas interconnection project in Colleton, South Carolina with a current status of active.

337.5 MWCapacity
ActiveStatus
SCMarket
GasTechnology

Project facts

Canonical nameSC Queue Project 284 — Gas in Colleton, South Carolina
Queue ID284
Statusactive
Source status2025 Cluster
MarketSC
TechnologyGas
Capacity337.5 MW
StateSouth Carolina
CountyColleton
Point of interconnection
Requested (queue) date2025-02-10
Proposed in-service date2029-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata