SC Queue Project 302 — Gas in Colleton, South Carolina

SC Queue Project 302 — Gas in Colleton, South Carolina is a 457.6 MW gas interconnection project in Colleton, South Carolina with a current status of withdrawn.

457.6 MWCapacity
WithdrawnStatus
SCMarket
GasTechnology

Project facts

Canonical nameSC Queue Project 302 — Gas in Colleton, South Carolina
Queue ID302
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologyGas
Capacity457.6 MW
StateSouth Carolina
CountyColleton
Point of interconnection—
Requested (queue) date2025-05-29
Proposed in-service date2032-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-10-05
Data last materially changed2026-10-05
Page data generated2026-10-11

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata