SC Queue Project 313 — Solar+Battery in Sumter, South Carolina

SC Queue Project 313 — Solar+Battery in Sumter, South Carolina is a 55.0 MW solar+battery interconnection project in Sumter, South Carolina with a current status of active. It is proposed to connect at PINEWOOD 69 - 115KV SUBSTATION.

55.0 MWCapacity
ActiveStatus
SCMarket
Solar+BatteryTechnology

Project facts

Canonical nameSC Queue Project 313 — Solar+Battery in Sumter, South Carolina
Queue ID313
Statusactive
Source status2025 Cluster
MarketSC
TechnologySolar+Battery
Capacity55.0 MW
StateSouth Carolina
CountySumter
Point of interconnectionPINEWOOD 69 - 115KV SUBSTATION
Requested (queue) date2025-06-02
Proposed in-service date2029-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata