SC Queue Project 320 — Gas in Aiken, South Carolina

SC Queue Project 320 — Gas in Aiken, South Carolina is a 767.5 MW gas interconnection project in Aiken, South Carolina with a current status of withdrawn. It is proposed to connect at AIKEN 230-115 (AIKEN NO.3).

767.5 MWCapacity
WithdrawnStatus
SCMarket
GasTechnology

Project facts

Canonical nameSC Queue Project 320 — Gas in Aiken, South Carolina
Queue ID320
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologyGas
Capacity767.5 MW
StateSouth Carolina
CountyAiken
Point of interconnectionAIKEN 230-115 (AIKEN NO.3)
Requested (queue) date2026-04-01
Proposed in-service date2033-01-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-24statusactivewithdrawnhigh
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata