SC Queue Project 324 — Battery in Horry, South Carolina
SC Queue Project 324 — Battery in Horry, South Carolina is a 150.0 MW battery interconnection project in Horry, South Carolina with a current status of active. It is proposed to connect at CONWAY 115 KV SWITCHING STATION.
150.0 MWCapacity
ActiveStatus
SCMarket
BatteryTechnology
Project facts
| Canonical name | SC Queue Project 324 — Battery in Horry, South Carolina |
|---|---|
| Queue ID | 324 |
| Status | active |
| Source status | 2026 Cluster |
| Market | SC |
| Technology | Battery |
| Capacity | 150.0 MW |
| State | South Carolina |
| County | Horry |
| Point of interconnection | CONWAY 115 KV SWITCHING STATION |
| Requested (queue) date | 2026-04-01 |
| Proposed in-service date | 2028-08-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | South Carolina Public Service Authority (Santee Cooper) |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata