SC Queue Project 325 — Battery in Horry, South Carolina

SC Queue Project 325 — Battery in Horry, South Carolina is a 150.0 MW battery interconnection project in Horry, South Carolina with a current status of active. It is proposed to connect at CONWAY 115 KV SWITCHING STATION.

150.0 MWCapacity
ActiveStatus
SCMarket
BatteryTechnology

Project facts

Canonical nameSC Queue Project 325 — Battery in Horry, South Carolina
Queue ID325
Statusactive
Source status2026 Cluster
MarketSC
TechnologyBattery
Capacity150.0 MW
StateSouth Carolina
CountyHorry
Point of interconnectionCONWAY 115 KV SWITCHING STATION
Requested (queue) date2026-04-01
Proposed in-service date2028-08-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-10-05
Data last materially changed2026-10-05
Page data generated2026-10-11

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata