SC Queue Project 35 — Gas in Cainhoy, South Carolina

SC Queue Project 35 — Gas in Cainhoy, South Carolina is a 27.5 MW gas interconnection project in Cainhoy, South Carolina with a current status of operational. It is proposed to connect at Masked.

27.5 MWCapacity
OperationalStatus
SCMarket
GasTechnology

Project facts

Canonical nameSC Queue Project 35 — Gas in Cainhoy, South Carolina
Queue ID35
Statusoperational
Source statusOperational
MarketSC
TechnologyGas
Capacity27.5 MW
StateSouth Carolina
CountyCainhoy
Point of interconnectionMasked
Requested (queue) date2014-06-30
Proposed in-service date
Operational date2016-07-01
Withdrawn date
Developer
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.