SC Queue Project 48 — Solar in Horry, South Carolina

SC Queue Project 48 — Solar in Horry, South Carolina is a 75.0 MW solar interconnection project in Horry, South Carolina with a current status of operational. It is proposed to connect at Bucksville 230-115 kV.

75.0 MWCapacity
OperationalStatus
SCMarket
SolarTechnology

Project facts

Canonical nameSC Queue Project 48 — Solar in Horry, South Carolina
Queue ID48
Statusoperational
Source statusComplete
MarketSC
TechnologySolar
Capacity75.0 MW
StateSouth Carolina
CountyHorry
Point of interconnectionBucksville 230-115 kV
Requested (queue) date2017-09-18
Proposed in-service date
Operational date2019-09-01
Withdrawn date
Developer
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata