SC Queue Project 62 — Solar in Lexington, South Carolina

SC Queue Project 62 — Solar in Lexington, South Carolina is a 75.0 MW solar interconnection project in Lexington, South Carolina with a current status of operational. It is proposed to connect at N/A.

75.0 MWCapacity
OperationalStatus
SCMarket
SolarTechnology

Project facts

Canonical nameSC Queue Project 62 — Solar in Lexington, South Carolina
Queue ID62
Statusoperational
Source statusOperational
MarketSC
TechnologySolar
Capacity75.0 MW
StateSouth Carolina
CountyLexington
Point of interconnectionN/A
Requested (queue) date2017-11-16
Proposed in-service date
Operational date2019-12-31
Withdrawn date
DeveloperAllora
Utility / transmission ownerSouth Carolina Public Service Authority (Santee Cooper)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata