Scatter Wash 2 (67455_SW2)

Scatter Wash 2 is a 85.0 MW battery interconnection project in Maricopa, Arizona with a current status of operational.

85.0 MWCapacity
OperationalStatus
AZPSMarket
BatteryTechnology

Project facts

Canonical nameScatter Wash 2
Queue ID67455_SW2
Statusoperational
Source status(OP) Operating
MarketAZPS
TechnologyBattery
Capacity85.0 MW
StateArizona
CountyMaricopa
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-04-01
Withdrawn date—
Developer—
Utility / transmission ownerScatter Wash Energy Storage, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata