SE Greene Co 230kV substation (J1500)

SE Greene Co 230kV substation is a 150.0 MW solar interconnection project in George, Mississippi with a current status of withdrawn. It is proposed to connect at SE Greene Co 230kV substation.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSE Greene Co 230kV substation
Queue IDJ1500
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateMississippi
CountyGeorge
Point of interconnectionSE Greene Co 230kV substation
Requested (queue) date2020-06-19
Proposed in-service date2023-10-30
Operational date2023-10-30
Withdrawn date2021-12-08
Developer
Utility / transmission ownerCOOPERATIVE ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.