SE Greenville 115kV Substation (J1070)

SE Greenville 115kV Substation is a 100.0 MW solar interconnection project in Washington County, Mississippi with a current status of withdrawn. It is proposed to connect at SE Greenville 115kV Substation.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSE Greenville 115kV Substation
Queue IDJ1070
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateMississippi
CountyWashington County
Point of interconnectionSE Greenville 115kV Substation
Requested (queue) date2018-03-12
Proposed in-service date2021-09-15
Operational date2021-09-15
Withdrawn date2019-08-29
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.