SE Richland (L0387)

SE Richland is a 35.5 MW other interconnection project in Benton, Washington with a current status of operational. It is proposed to connect at Badger Canyon Substation.

35.5 MWCapacity
OperationalStatus
WAMarket
OtherTechnology

Project facts

Canonical nameSE Richland
Queue IDL0387
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyOther
Capacity35.5 MW
StateWashington
CountyBenton
Point of interconnectionBadger Canyon Substation
Requested (queue) date2015-08-07
Proposed in-service date
Operational date2018-10-01
Withdrawn date
DeveloperCity of Richland, Washington
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.