Second 1200 MW Data Center Load (L0682)

Second 1200 MW Data Center Load is a 1,200.0 MW other interconnection project with a current status of active. It is proposed to connect at Lower Monumental-McNary No. 1 500 kV line.

1,200.0 MWCapacity
ActiveStatus
Market
OtherTechnology

Project facts

Canonical nameSecond 1200 MW Data Center Load
Queue IDL0682
Statusactive
Source statusRECEIVED
Market
TechnologyOther
Capacity1,200.0 MW
State
CountyWalla Walla
Point of interconnectionLower Monumental-McNary No. 1 500 kV line
Requested (queue) date2026-01-15
Proposed in-service date2029-01-15
Operational date
Withdrawn date
DeveloperColumbia Rural Electric Association
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.